The new primary school at Baakenhafen
A primary school has been built right on the Baakenhafen, on one of Hamburg’s most challenging building sites. This project demonstrates what modern school construction can look like: functional, resilient and forward-looking. Our team at the Hamburg branch was involved from the very beginning and provided technical and planning support throughout the construction process. Together, we succeeded in bringing this challenging project to fruition – despite complex geological and technical conditions.
Building a school on challenging terrain
This project was not just about constructing a new building, but about tackling complex planning and construction challenges at the Baakenhafen site. Here, right on the banks of the Elbe, in the heart of one of Hamburg’s most dynamic development areas, a primary school has been built that blends perfectly into its urban surroundings. Despite the limited space available, the design offered solutions that are both functionally and aesthetically compelling. The two-storey sports hall in the basement saves space, whilst the school playground on the roof provides an area for play and physical activity.
However, the site presented its own challenges: situated directly on the banks of the River Elbe, the land was heavily contaminated with petroleum hydrocarbons (MKW) and polycyclic aromatic hydrocarbons (PAHs) due to its former use as a tar storage facility for the port.
Added to this was its location directly on the River Elbe, just 40 metres from a body of water where a tidal range of up to 3.5 metres causes water levels to fluctuate significantly, making groundworks even more challenging.
Yet even on this difficult terrain, a secure foundation for the new primary school was successfully established.

The challenges of a unique location
Our team was involved in the planning and implementation of the project right from the start. One of the key tasks was to prepare the site: a comprehensive grid survey revealed that the soil at depths of between two and six metres was heavily contaminated with MKW and PAHs. To ensure safe site remediation, ‘black’ and ‘white’ zones were established, involving the strict separation of contaminated and uncontaminated work areas. Contaminated excavated material was disposed of in a controlled manner.
In parallel, detailed site and foundation surveys were carried out to ensure the long-term stability of the school building. With the aid of a watertight trough-shaped excavation pit, fitted with a bored pile wall and a solid HDI base, both the structural loads and the protection against uplift were ensured by means of compression and tension piles.
At a glance:
Flood protection in the heart of HafenCity
Particular attention was paid to the building’s flood protection. In line with HafenCity’s ‘Warften’ concept, all roads and buildings were constructed to flood-proof levels. Our contribution comprised the development of a flood protection concept, the submission of applications under water law, and the provision of a continuous flood protection service with an on-call alert system during the storm surge season from September to March.
The building’s immediate proximity to the River Elbe also required a well-thought-out water management concept to keep the excavation pit dry and control the inflow of water. This was reliably achieved through additional pumping tests and appropriate measures.
Support down to the last detail
In addition to the measures taken to stabilise the ground, we oversaw the tendering process for specialist civil engineering and earthworks, as well as the on-site construction supervision. Our remit also included the preservation of evidence, the disposal of contaminated soil and the monitoring of soil compaction. We also inspected the grouting of dismantled shoring beams in the side areas to rule out any subsequent settlement or instability.
In addition to the remediation and foundation works, we contributed to the tendering and planning of the specialist civil engineering works and, through our on-site specialist site management, ensured sustainable and safe implementation.
A successfully completed project

Why work with us?
More than 75 years of experience
Since 1948, GINGER HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.
Strong international network
With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.
Highest Quality Standards
Our solutions deliver technically flawless results, well-thought-out details, and an uncompromising commitment to quality at every stage of your project.
Our Service Areas
Land Recycling
Experience. Responsibility. Worldwide.
Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…
Environment and Safety
Experience. Responsibility. Worldwide.
The environment and our living conditions determine our quality of life. Development entails changes. Environmental development is the result of many…
Infrastructure
Experience. Accountability. Valorisation.
Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…
Got a project in mind?
We have the solution.