New Elementary School at Baakenhafen/HafenCity, Hamburg

Project description:

New construction of an elementary school in close proximity to the banks of the Elbe. Four upper floors, a rooftop playground, and an underground gymnasium. Mound concept: All streets and buildings in HafenCity are accessible at a flood-safe level. Soft soil and solid existing foundations.

Reason:

  • Construction of a completely new neighborhood in downtown Hamburg
  • New elementary school needed in a confined space to serve local residents

Services:

  • Site and Foundation Reports for multiple planning options
  • Grid-based survey at the site of the port’s former tar yard
  • Pumping tests to assess water inflow into the excavation pit
  • Work and Safety Plan for the disposal of contaminated soil
  • Flood Prevention Plan, Water Management Plan, Evidence Preservation Plan, Waste Disposal Plan
  • Support for excavation planning and bidding for specialized civil engineering and earthwork projects
  • Water Law Applications
  • On-site Construction Supervision and Technical Construction Management
  • Flood Prevention Officer responsible for storm surge protection, storm surge forecasts, and continuous on-call duty from September 15 through March 31
  • Verification of the proper compaction of the space along the sides of the excavation pit and the compaction of dismantled shoring members using dynamic penetration tests

Advantages:

  • Safe and reliable planning and construction supervision

Additional project data:

  • Geotechnical challenge: Excavation up to 11 m deep
  • Watertight trough excavation pit with a bored pile wall and an HDI base
  • Pile foundation using partial-displacement bored piles: effective as compression piles for structural loads and as tension piles to counteract buoyancy in the gymnasium
Client:
Schulbau Hamburg
Project value:
650.000 €
Project duration:
2014 – 2025

Our strength – effective networking for power line expansion

Efficient planning and implementation of large-scale projects require collaboration—across locations and well-coordinated. Through networked collaboration, we are driving the expansion…
Learn more

Better air, healthier living: a focus on indoor air quality and mould control

Existing buildings tell their very own stories – whether through their construction, their ongoing use or the alterations made over…
Learn more

Tailor-made expertise for complex mining projects

Mining projects require a balance between technical excellence, environmental protection and social acceptance. With our multidisciplinary expertise, we are your…
Learn more

Future-proof water management: Rockflow in action at the Neuburg logistics centre

An innovative rainwater management solution was implemented for Rockwool’s new logistics centre in Neuburg. We were responsible for geotechnical engineering,…
Learn more

Safe demolition of the P+R car park in Filderstadt-Bernhausen

The P+R car park in Filderstadt-Bernhausen was partially demolished during the first construction phase in 2024 for structural reasons. This…
Learn more

Contaminated site remediation: groundwater protection at the former Rütgers Works

Protecting our environment requires perseverance and foresight – particularly in the case of historical contamination that has built up over…
Learn more

The new primary school at Baakenhafen

A primary school has been built right on the Baakenhafen, on one of Hamburg’s most challenging building sites. This project…
Learn more

Underground cabling: GINGER HPC as an advocate for soil and construction companies

The urgency of grid expansion to drive the energy transition has become particularly evident due to the Ukraine war. While…
Learn more

Building between two water levels

Hamburg’s HafenCity is one of the most impressive urban development projects in the city: since 2001, an entirely new district…
Learn more

Following the water: General drainage plan for Meerbusch

The task was clear: the general drainage plan, now 20 years old, needed to be updated. Not only were there…
Learn more

In-situ: Removed as if by magic

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant…
Learn more

Rockwool Neuburg: Construction in Record Time – Despite the Pandemic

The project began inconspicuously on a gray February day in early 2018. The two of us, Peter Struck and Moritz…
Learn more

Why work with us?

More than 75 years of experience

Since 1948, GINGER HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.

Strong international network

With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.

Highest Quality Standards

Our solutions deliver technically flawless results, well-thought-out details, and an uncompromising commitment to quality at every stage of your project.

Our Service Areas

Land Recycling

Land Recycling

Experience. Responsibility. Worldwide.

Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…

Environment and Safety

Environment and Safety

Experience. Responsibility. Worldwide.

The environment and our living conditions determine our quality of life. Development entails changes. Environmental development is the result of many…

Infrastructure

Infrastructure

Experience. Accountability. Valorisation.

Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…

Cookie Consent with Real Cookie Banner