Environmental Impact Assessment for the restoration of the lake „Salziger See”, Saxony-Anhalt, Germany

Project description:

Assessment of the impacts of the planned measure on following relevant goods: Natural Resources, Humans, Plants and Animals, Groundwater and Surface Waters, Climate, Soil and Archeological Cultural Monuments, Contaminated Sites, Geotechnical Risks and Mining Influences.

Services:

  • State project: restoration of the lake level of the “Salziger See

Advantages:

  • complete geoscientific and environmental consulting covered by the scientific spectrum of the Joint Venture Partners
  • special expert team with mining experience and detailed know-how

Additional project data:

  • Planning area: 840 ha
  • Conservation area “Salziger See“: 448 ha
  • As a result of the copper shale mining between 1891 and 1895 the lake “Salziger See” was totally dewatered
Client:
Entwicklungsgesellschaft Seengebiet Mansfelder Land mbH
Project value:
80.000 €
Project duration:
09/1990 – 03/2001

Our strength – effective networking for power line expansion

Efficient planning and implementation of large-scale projects require collaboration—across locations and well-coordinated. Through networked collaboration, we are driving the expansion…
Learn more

Better air, healthier living: a focus on indoor air quality and mould control

Existing buildings tell their very own stories – whether through their construction, their ongoing use or the alterations made over…
Learn more

Tailor-made expertise for complex mining projects

Mining projects require a balance between technical excellence, environmental protection and social acceptance. With our multidisciplinary expertise, we are your…
Learn more

Future-proof water management: Rockflow in action at the Neuburg logistics centre

An innovative rainwater management solution was implemented for Rockwool’s new logistics centre in Neuburg. We were responsible for geotechnical engineering,…
Learn more

Safe demolition of the P+R car park in Filderstadt-Bernhausen

The P+R car park in Filderstadt-Bernhausen was partially demolished during the first construction phase in 2024 for structural reasons. This…
Learn more

Contaminated site remediation: groundwater protection at the former Rütgers Works

Protecting our environment requires perseverance and foresight – particularly in the case of historical contamination that has built up over…
Learn more

The new primary school at Baakenhafen

A primary school has been built right on the Baakenhafen, on one of Hamburg’s most challenging building sites. This project…
Learn more

Underground cabling: GINGER HPC as an advocate for soil and construction companies

The urgency of grid expansion to drive the energy transition has become particularly evident due to the Ukraine war. While…
Learn more

Building between two water levels

Hamburg’s HafenCity is one of the most impressive urban development projects in the city: since 2001, an entirely new district…
Learn more

Following the water: General drainage plan for Meerbusch

The task was clear: the general drainage plan, now 20 years old, needed to be updated. Not only were there…
Learn more

In-situ: Removed as if by magic

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant…
Learn more

Rockwool Neuburg: Construction in Record Time – Despite the Pandemic

The project began inconspicuously on a gray February day in early 2018. The two of us, Peter Struck and Moritz…
Learn more

Why work with us?

More than 75 years of experience

Since 1948, GINGER HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.

Strong international network

With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.

Highest Quality Standards

Our solutions deliver technically flawless results, well-thought-out details, and an uncompromising commitment to quality at every stage of your project.

Our Service Areas

Land Recycling

Land Recycling

Experience. Responsibility. Worldwide.

Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…

Environment and Safety

Environment and Safety

Experience. Responsibility. Worldwide.

The environment and our living conditions determine our quality of life. Development entails changes. Environmental development is the result of many…

Infrastructure

Infrastructure

Experience. Accountability. Valorisation.

Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…

Cookie Consent with Real Cookie Banner