Demolition of the P+R Parking Garage, Filderstadt-Bernhausen, Baden-Württemberg

Project description:

The P+R parking garage at Filderbahnstr. 14 in Filderstadt-Bernhausen was scheduled to be demolished above ground due to structural defects. The lower levels and the ground floor, the access ramps, and the parking level above them—which serves as a temporary roof— were to remain in place for interim use. Concrete repair work must be carried out on the lowest parking level due to its proximity to the S-Bahn tunnel below.

Reason:

  • Demolition of an above-ground P+R parking garage due to structural defects

Services:

  • An analysis of various demolition options and technologies
  • Guidelines for remediation and proper disposal
  • Supervision of the concrete restoration work in the basement
  • Planning of BE areas and establishment of demolition boundaries, safety zones for pedestrians, buses, and traffic, and tree protection

Advantages:

  • One-Stop Service for Site Surveys, Planning, and Supervision of Demolition
  • Very high level of acceptance of the consulting work among government agencies and project partners

Additional project data:

  • The DB S-Bahn tunnel must not be damaged by the construction work.
  • Cramped conditions and a large number of restrictive site factors (e.g., bus traffic, limited space, high foot traffic, nearby residents)
  • Demolition using a construction crane due to the complex site conditions
Client:
Filderstadtwerke, a municipal enterprise of the City of Filderstadt, Seestraße 15, 70794 Filderstadt-Sielmingen
Project value:
approx. 120.000 €
Project duration:
01/2024 – 12/2024

Underground cabling: GINGER HPC as an advocate for soil and construction companies

The urgency of grid expansion to drive the energy transition has become particularly evident due to the Ukraine war. While…
Learn more

Building between two water levels

Hamburg’s HafenCity is one of the most impressive urban development projects in the city: since 2001, an entirely new district…
Learn more

Following the water: General drainage plan for Meerbusch

The task was clear: the general drainage plan, now 20 years old, needed to be updated. Not only were there…
Learn more

In-situ: Removed as if by magic

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant…
Learn more

Rockwool Neuburg: Construction in Record Time – Despite the Pandemic

The project began inconspicuously on a gray February day in early 2018. The two of us, Peter Struck and Moritz…
Learn more

Federal Immission Control Act of Germany: GINGER HPC as translator

In the early 1970s, the German Federal Government presented its first environmental programme. The Federal Immission Control Act is intended…
Learn more

The vision for Kesslergrube: Germany’s ambitious remediation of a polluted area

Ambitious remediation of a polluted area instead of “out of sight, out of mind”. GINGER HPC AG is thoroughly remediating…
Learn more

Tracing Elmshorn’s Past – Between Historical Contaminated Sites and Modern Urban Redevelopment

The northern German city of Elmshorn is reinventing its center: a new town hall, new residential and commercial buildings, and…
Learn more

Award-Winning! Contaminated Site Remediation in Ulm

Following extensive investigations for unexploded ordnance, the contaminated soil will be removed using overlapping large-diameter boreholes down to 7 m…
Learn more

Back on Track: New Pipelines for Clean Water

60 years that is roughly the service life of sewer systems. Why does that matter? When wastewater no longer flows…
Learn more

GINGER HPC and the IQ Towers of Hamburg’s HafenCity

Anyone visiting the heart of Hamburg – HafenCity – usually looks at the impressive new and historic buildings or out…
Learn more

Tunnel festival at the U3 subway construction site in Nuremberg

At last, we were able to properly celebrate the long-awaited tunnel breakthrough of the new U3 subway section in Nuremberg…
Learn more

Why work with us?

More than 75 years of experience

Since 1948, GINGER HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.

Strong international network

With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.

Award-winning sustainability

From international certifications to industry awards, our achievements reflect engineering precision, high standards, and a continuous drive for innovation.

Our Service Areas

Land Recycling

Land Recycling

Experience. Responsibility. Worldwide.

Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…

Environment and Safety

Environment and Safety

Experience. Responsibility. Worldwide.

The environment and our living conditions determine our quality of life. Development entails changes. Sustainable environmental development is the…

Infrastructure

Infrastructure

Experience. Accountability. Valorisation.

Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…

Cookie Consent with Real Cookie Banner