In-situ: Removed as if by magic

Biological-chemical in-situ remediation of LHKWs

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant remediation – with success!

This group of substances already sounds difficult to tackle: volatile halogenated hydrocarbons, VHHC. And indeed, once they have seeped into the soil, they are hardly controllable. VHHC are used to degrease metals, remove paint, or clean textiles. These chemicals are particularly well studied, as they are found in many locations – including at an industrial site in southwestern Germany. There, Bernadette Bohnert, Günter Dernai, and Thomas Osberghaus dedicated themselves to a special experiment. They attempted to neutralize the VHHC compounds using a biological-chemical in-situ reduction.

“The remediation of contaminated sites was also necessary because the source of contamination was located in a water protection area.” – Bernadette Bohnert
Head of Contaminated Sites at GINGER HPC in Stuttgart

In such cases, groundwater is often pumped and continuously treated over many years—this was initially also the approach here. In the short term, such groundwater extraction only has a minor impact on investment or operating costs. However, in this case, the system had a high electricity consumption and exhibited a tailing effect. This describes a typical course of remediation for LHKWs, where concentrations initially drop sharply and then remain nearly constant over a long period. When extrapolated, the concentration trend suggested that this conventional remediation would take more than 10 years to complete—a considerable amount of time.

Given these timeframes and costs, Bernadette Bohnert and her team at GINGER HPC proposed an in-situ remediation method to the client. This method neutralizes contamination directly on site. Their choice was a biological-chemical in-situ decontamination of LHKWs using EHC® from Evonik. This substance can react with LHKW compounds in various ways.

“This substance triggers several reactions, including chemical degradation and microbiological degradation by bacteria, provided that the redox environment in the subsurface is sufficiently low.” – Bernadette Bohnert.

To verify the effectiveness of the in-situ substance, the GINGER HPC team carried out several injection drillings. This was not a simple task. The production site, which was contaminated at the time, was by no means shut down, heavily built-up, and the subsurface was compacted. After successfully carrying out the injections, groundwater monitoring was conducted over the course of a year. The results were impressive: the LHKWs were largely transformed through various intermediate stages into non-toxic ethene.

In this case, the in-situ decontamination was comparatively cost-effective, efficient, and highly effective due to the small area involved. For larger contaminated sites and aquifers, however, both effort and costs increase accordingly.

“Based on thorough preliminary investigations, cost-effectiveness analyses, and experience from hundreds of comparable projects, we develop a tailored solution for each individual case.” – Bernadette Bohnert.

Project duration:
Over 1 Year
Project location:
Southwest Germany

Our strength – effective networking for power line expansion

Efficient planning and implementation of large-scale projects require collaboration—across locations and well-coordinated. Through networked collaboration, we are driving the expansion…
Learn more

Better air, healthier living: a focus on indoor air quality and mould control

Existing buildings tell their very own stories – whether through their construction, their ongoing use or the alterations made over…
Learn more

Tailor-made expertise for complex mining projects

Mining projects require a balance between technical excellence, environmental protection and social acceptance. With our multidisciplinary expertise, we are your…
Learn more

Future-proof water management: Rockflow in action at the Neuburg logistics centre

An innovative rainwater management solution was implemented for Rockwool’s new logistics centre in Neuburg. We were responsible for geotechnical engineering,…
Learn more

Safe demolition of the P+R car park in Filderstadt-Bernhausen

The P+R car park in Filderstadt-Bernhausen was partially demolished during the first construction phase in 2024 for structural reasons. This…
Learn more

Contaminated site remediation: groundwater protection at the former Rütgers Works

Protecting our environment requires perseverance and foresight – particularly in the case of historical contamination that has built up over…
Learn more

The new primary school at Baakenhafen

A primary school has been built right on the Baakenhafen, on one of Hamburg’s most challenging building sites. This project…
Learn more

Underground cabling: GINGER HPC as an advocate for soil and construction companies

The urgency of grid expansion to drive the energy transition has become particularly evident due to the Ukraine war. While…
Learn more

Building between two water levels

Hamburg’s HafenCity is one of the most impressive urban development projects in the city: since 2001, an entirely new district…
Learn more

Following the water: General drainage plan for Meerbusch

The task was clear: the general drainage plan, now 20 years old, needed to be updated. Not only were there…
Learn more

In-situ: Removed as if by magic

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant…
Learn more

Rockwool Neuburg: Construction in Record Time – Despite the Pandemic

The project began inconspicuously on a gray February day in early 2018. The two of us, Peter Struck and Moritz…
Learn more

Why work with us?

More than 75 years of experience

Since 1948, GINGER HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.

Strong international network

With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.

Highest Quality Standards

Our solutions deliver technically flawless results, well-thought-out details, and an uncompromising commitment to quality at every stage of your project.

Our Service Areas

Land Recycling

Land Recycling

Experience. Responsibility. Worldwide.

Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…

Environment and Safety

Environment and Safety

Experience. Responsibility. Worldwide.

The environment and our living conditions determine our quality of life. Development entails changes. Environmental development is the result of many…

Infrastructure

Infrastructure

Experience. Accountability. Valorisation.

Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…

Cookie Consent with Real Cookie Banner